Product Detail
Gabion baskets are made of heavy galvanized wire / ZnAl (Galfan) coated wire / PVC or PE coated wires the mesh shape is hexagonal style. The gabion baskets are used widely in slope protection foundation pit supporting mountain rock holding river and dams scour protection.
It is mainly used as the slope protection structure of river, bank slope and subgrade slope.It can prevent the river from being destroyed by water flow and wind waves, and realize the natural convection and exchange function between the water body and the soil under the slope to achieve the ecological balance.Slope planting green can add landscape and greening effect.
Gabion bakset common specification | |||
Gabion box (mesh size): 80*100mm 100*120mm | Mesh wire Dia. | 2.7mm | zinc coating:60g,245g, ≥270g/m2 |
Edge wire Dia. | 3.4mm | zinc coating:60g,245g, ≥270g/m2 | |
Tie wire Dia. | 2.2mm | zinc coating:60g,≥220g/m2 | |
Gabion mattress(mesh size): 60*80mm | Mesh wire Dia. | 2.2mm | zinc coating:60g, ≥220g/m2 |
Edge wire Dia. | 2.7mm | zinc coating:60g,245g, ≥270g/m2 | |
Tie wire Dia. | 2.2mm | zinc coating:60g, ≥220g/m2 | |
special sizes Gabion are available
| Mesh wire Dia. | 2.0~4.0mm | superior quality,competitive price and considerate service |
Edge wire Dia. | 2.7~4.0mm | ||
Tie wire Dia. | 2.0~2.2mm |
Applications
1. Control and guide the rivers and floods
2. Spillway dam and diversion dam
3. Rock fall protection
4. To prevent water loss
5. Bridge protection
6. Solid soil structure
7. Coastal defense works
8. Port project
9. Retaining Walls
10. Road Protection
Installation Process
1. Ends,diaphragms,front and back panels are placed upright on the bottom section of wire mesh
2. Secure panels by screwing sprial binders through the mesh openings in adjacent panels
3. Stiffeners shall be placed across the corners, at 300mm from the corner. Providing a diagonal bracing,and crimped
4. Box gabion filled with graded stone by hand or with a shovel.
5. After filling,close the lid and secure with sprial binders at the diaphragms,ends,front and back.
6. When stacking tiers of the weled gabion,the lid of the lower tier may serve as base of the upper tier.Secure with sprial binders and add pre-formed stiffeners to exterior cells before filling with graded stones.